
A Fortune 200 renewable operator
Version Control and HIL for PLC Code
Controls code lived on engineers' laptops with no history, no review, and no way to test a change before it hit a live plant.
Read case studyCase Studies
A look at real engagements - what was broken, what SCADADOG built, and what changed. Client projects run under NDA, so the details that matter stay in; the names that do not need to be there stay out.

A Fortune 200 renewable operator
Controls code lived on engineers' laptops with no history, no review, and no way to test a change before it hit a live plant.
Read case study
A Fortune 200 renewable operator
Ten solar sites, ten different tag naming schemes, nothing reusable from one site to the next.
Read case study
A Fortune 200 renewable operator
Construction turnover packages arrive as thousands of pages of PDFs - full of asset data nobody can query.
Read case study
Feeding South Florida (via Spirit Tech)
A food bank wanted to use AI - but first needed to know where its data was missing and where AI would earn its keep.
Read case study
Well-Water-Systems
Remote water sites had no live visibility - the only way to check one was to send a truck out to it.
Read case study
A Fortune 200 renewable operator
Battery-storage layouts were redrawn by hand every time a parameter changed, costing days of engineering time.
Read case study
A Fortune 200 renewable operator
Turbine and inverter power curves existed only inside issued-for-construction drawings, unusable to any model.
Read case study
A Fortune 200 renewable operator
Contractual battery efficiency was being reconstructed in spreadsheets every month, by hand, from exported data.
Read case study
A Fortune 200 renewable operator
SCADA tag lists drift from reality as sites change - and nobody notices until a screen or a report is wrong.
Read case studyWith a clear look at where the data was missing or manual. That is the cheapest, lowest-risk place to begin.
Start with a one-site data gap assessment